Bathroom Remodeling
Victory Home Remodeling offers efficient solutions for Bellevue bathroom remodel that aims to make your bath more functional and beautiful. With the most trusted Bellevue bathroom remodeling contractors by your side, you can create your elegant bathroom sanctuary to relax in luxury.
Our team would help you with a wide range of bathroom remodeling service, including a full bath layout redesign or addition of utility. We would also help you with specific tasks like installing a new bathtub or vanity and setting up a shower enclosure.
A well-planned bathroom remodel can be divided into many different stages like designing, getting the permits, construction, and others. Victory Home Remodeling would help you execute all these stages so that you get a truly stunning bathroom.
Victory Home Remodeling offers efficient solutions for Bellevue bathroom remodel that aims to make your bath more functional and beautiful. With the most trusted Bellevue bathroom remodeling contractors by your side, you can create your elegant bathroom sanctuary to relax in luxury.
Victory Home Remodeling
Our Bathroom Remodeling Process
Here are the steps and processes that we follow for bathroom remodeling in Bellevue:
1. First Meeting

The first stage of the process is planning, where you set clear goals about what you want from the project.
We will visit your premises and analyze the existing bath space. We will also have a detailed discussion with you about the things you want to be done. This would help in creating an actionable plan.
Next, a cost estimate will be prepared based on the initial discussions. This would include the cost of the materials, the fees for the permits (if any), the labor costs, and any other such components.
Our Bellevue bathroom remodel contractor will create 3D designs that will help you visualize how your bathroom will look once the work is completed. After getting your approvals, we would proceed to the next step.
2. Design and Estimate

3. bathroom Remodeling Permit

After the designs are finalized, we would have to apply for permits. When you are remodeling a bathroom, you must apply for a remodeling permit at the Department of Development Services in the City of Bellevue.
In most cases, you would need to apply for the Single Family Remodel Permit. In some cases, you can qualify for a Single Family Remodel Permit – No Plan Review. This might help you to get the permit in significantly less time. Speak to our consultant for bathroom remodeling in Bellevue to know which plan would work best for you.
Based on certain cases, you might need to apply for other permits as well:
Plumbing Permit: If you are looking to make significant changes, like replacing your bathtub with a 2-inch drain, and comply with the building codes then you would need to apply for a plumbing permit.
Electrical Permit: When you are looking to make significant changes to your bathroom’s electrical system, like getting a new heating system, then you would need to apply for an electrical permit.
Contact us and we would help you deal with the entire process of getting a permit for bathroom remodeling so that you don’t have to go through the hassles.
4. Work Begins

After getting your approval on the design and the required remodeling permits from the City Council, we would begin the remodeling work. As one of the most experienced Bellevue bathroom remodelers, we complete the work in the following phases to maximize efficiency.
Deconstruction: Based on the design, we might have to deconstruct your existing bathroom first. We will tape off the area and ensure that the debris doesn’t spread to the other areas of your home.
Framing, Electrical & Plumbing Work: Once the deconstruction work is completed, we would install the new frames, electrical wiring, and pipes to get a sturdy infrastructure in place. During this stage, the initial inspection would be done by the City office.
Hanging Drywall and Insulation: After the inspection is done and the work is approved, we would hang and finish your drywall and insulation. This would give a kind of form to your bath space and also offer an effective insulation and heating system.
Tiling: At this step, we would work on the tiling of the walls and floors of your bath. We would also work on installing the backsplash and sink countertops. To ensure a perfect finish, we would use proper elevation, installation, and grout sealing techniques.
Fixing, Refinishing, or Installing Shower Trims, Tub, and Toilet: You will either need to fix and refinish or upgrade your toilet, tub, and shower trim to enhance the functionality and comfort of your bath. Fixing and refinishing would be a cost-effective option.
Bathroom Vanity and Cabinets: Last but not the least, we would need to work on your vanity tops and cabinetry. We can install quartz, granite, marble, and other kinds of countertops with ease. When it comes to cabinets, we can install hardwood, laminate, and particle board cabinets. We can also refinish your cabinets, a cost-effective and time-saving option.
Final Checks: After the work is done, we would run a final check to make sure that everything is done and finished to perfection.
5. scheduling Inspection

Once all the work is done, we would run a thorough check before the scheduled inspection. As a bathroom remodeling contractor, we would help you handle the inspections.
The City Council would then send an inspector to ensure that all the work is done according to the designs that were sent to the department. After everything checks out, they will give you the final approval.
The city inspectors would visit your premises multiple times to ensure that the work is being done according to the approved plan.
1. Rough In Inspection – This is the first inspection. Once all the electrical and plumbing work is done and just before the walls are closed up, the electrical, plumbing, and building inspectors will ensure the work is done up to the code.
2. Second Inspection – Once the work is done, another round of inspection will be conducted and you will be given a checklist of items that need to be changed. We would schedule another inspection by the City Inspectors for verification.
3. Final Inspection – When we have checked everything is done to perfection, the inspectors would visit and inspect the bathroom before giving you the final approval.
Approximate Timeline for Bathroom Remodel
Here is a brief outline of the approximate time it will take to complete the major stages of your bathroom remodel process:
Work | Time (Approximate) |
Deconstruction | 1 to 2 days |
Installing new frames | 2 to 4 days |
Rough-in work | 4 to 10 days |
Initial Inspection | 1 day |
Installing/Repairing doors and windows | 2 to 4 days |
Drywall & insulation | 1 to 2 days |
Tile installation | 3 to 7 days |
Painting | 2 to 5 days |
Vanity installation | 3 to 5 days |
Cabinets | 1 to 2 days |
Upgrading shower, tubs, toilet: | 2 to 4 days |
Final inspection and adjustments | 2 to 4 days |
* This is just an estimate of the time taken to complete the tasks for Bellevue bathroom remodel. The time taken would depend on the work that is to be done and its complexity. After carefully assessing your kitchen and your requirements, our team would be able to give you a more accurate estimate.

Frequently
Asked
Questions
What is included in a bathroom remodeling project?
Bathroom remodeling typically includes layout redesign, plumbing and electrical upgrades, flooring and tiling, vanity and cabinetry installation, and the addition of features like bathtubs, shower enclosures, or modern fixtures.
Do I need a permit for bathroom remodeling in Bellevue?
Yes, you will need permits for most bathroom remodeling projects, especially if you’re making structural changes, installing new plumbing fixtures, or modifying the electrical system. Victory Home Remodeling will manage the permit process for you.
How long does it take to remodel a bathroom?
A bathroom remodeling project typically takes 2 to 6 weeks, depending on the scope and complexity. After assessing your requirements, we’ll provide a detailed timeline tailored to your project.
What is the typical workflow for bathroom remodeling?
- Initial Consultation and Planning
- Design and Budgeting
- Permit Acquisition
- Demolition and Preparation
- Plumbing and Electrical Work
- Drywall, Insulation, and Tiling
- Installing Fixtures, Vanities, and Cabinets
- Painting and Finishing Touches
- Final Inspection and Project Handover
Can I use my bathroom during remodeling?
In most cases, the bathroom being remodeled will be out of use during the project. If you have multiple bathrooms, we ensure minimal disruption by working on one at a time.